Case Study:
House together with Stables and Outbuildings

Frant, East Sussex
Repairing exterior timbers and poviding a long lasting paint finish.

The Project

The Project
The estate managers for this property were seeking a long term solution to redecoration - increasing the time span between exterior redecoration by at least two years, compared to standard coatings. The property also needed repair work to exterior timbers, treatment of wet rot, and alternative varnishes which would not peel.

Our Solution

Our Solution
Perfect Painting advised the client on a paint system which could deliver and also specified coatings which were highly resistant to UV – the cause of the peeling. The timbers were repaired with specialist two part wood fillers. The paint we used incorporated a patented styrene acrylic reinforced resin which offered longer periods between maintenance.

The Outcome

The Outcome
The long term solution the estate managers desired.